<?xml version="1.0" encoding="utf-8"?>
<KD_8_1_Z2 xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.brz.gv.at/eproc/kd/2018/12">
  <CONTRACTING_BODY>
    <ADDRESS_CONTRACTING_BODY>
      <OFFICIALNAME>ÖBB-Infrastruktur AG</OFFICIALNAME>
      <NATIONALID>FN71396w</NATIONALID>
      <PHONE>+43 664 2866302</PHONE>
      <E_MAIL>Gerald.Winkler@oebb.at</E_MAIL>
      <CONTACT>Winkler Gerald</CONTACT>
    </ADDRESS_CONTRACTING_BODY>
    <DOCUMENT_FULL />
    <URL_DOCUMENT>https://www.provia.at/bieterportal/VeroeffentlichteElemente/Verfahren/40286</URL_DOCUMENT>
    <URL_PARTICIPATION>https://provia.at</URL_PARTICIPATION>
  </CONTRACTING_BODY>
  <OBJECT_CONTRACT>
    <TITLE>
      <P>KRT2A Karawankentunnel (Karawanks Railway Tunnel) - Bahntechnische Ausrüstung (Technical equipment)</P>
    </TITLE>
    <REFERENCE_NUMBER>40286</REFERENCE_NUMBER>
    <CPV_MAIN>
      <CPV_CODE CODE="45311000" />
    </CPV_MAIN>
    <TYPE_CONTRACT CTYPE="WORKS" />
    <SHORT_DESCR>
      <P>Im Zuge der Umbaumaßnahmen im Karawankentunnel sind umfangreiche SFE –   -Signal/Fernmelde/Elektro - Leistungen wie folgt vorgesehen:</P>
      <P>Karawankentunnel:</P>
      <P>Herstellung einer 5kV Stromversorgung vom Kraftwerke Rosenbach</P>
      <P>Herstellung einer 20kV Stromversorgung vom slowenischen Elektroversorgungsunternehmen</P>
      <P>Herstellung einer 10kV Stromversorgung im KWT über Kuppeltrafos</P>
      <P>Errichtung von 10kV Trafostationen sowie 230/400V USV- Umschaltanlagen in den Technikräumen</P>
      <P>Energieversorgung der Telekom und maschinellen Anlagen (Klima)</P>
      <P>E- Installationen und Beleuchtung in den Portalstationen und Technikstationen im Tunnel</P>
      <P>Herstellung einer Orientierungsbeleuchtung (beleuchteter LED- Handlauf) in der Tunnelröhre</P>
      <P>Montage von Elektranten und LED-Taster in den Tunnelröhren</P>
      <P>Beleuchtung der Rettungsplätze</P>
      <P>Herstellung einer OLSIG - Oberleitungssignalisierungsanlage (OL- AUS, Erdung EIN, Schlüsselsperre)</P>
      <P>Verkabelungsarbeiten für Telematik, Oberleitung und Signaltechnik</P>
      <P>Erdungsmaßnahmen</P>
      <P>Bhf. Rosenbach:</P>
      <P>Erweiterung der WHZ – Anlagen</P>
      <P>Anpassung der Gleisfeld und Weichenbeleuchtung</P>
      <P>Erdungsmaßnahmen</P>
      <P />
      <P>In the course of the reconstruction measures in the Karawanken tunnel, extensive SFE signal/telecommunication/electrical services are planned as follows:</P>
      <P>Karawankentunnel:</P>
      <P>Production of a 5kV power supply from Rosenbach power station</P>
      <P>Production of a 20kV power supply from the Slovenian power supply company</P>
      <P>Production of a 10kV power supply in KWT via dome transformers</P>
      <P>Installation of 10kV transformer stations as well as 230/400V UPS switchover systems in the technical rooms</P>
      <P>Energy supply for telecom and mechanical systems (climate)</P>
      <P>E- Installations and lighting in the portal stations and technical stations in the tunnel</P>
      <P>Production of orientation lighting (illuminated LED handrail) in the tunnel tube</P>
      <P>Installation of electrants and LED push-buttons in the tunnel tubes</P>
      <P>Lighting of rescue areas</P>
      <P>Production of OLSIG overhead line signalling system (OL-OFF, grounding ON, key lock)</P>
      <P>Cabling work for telematics, overhead lines and signalling technology</P>
      <P>earthing measures</P>
      <P>Bhf. Rosenbach:</P>
      <P>Extension of the WHZ facilities</P>
      <P>Adaptation of the track field and turnout lighting</P>
      <P>earthing measures</P>
    </SHORT_DESCR>
    <NO_LOT_DIVISION />
    <OBJECT_DESCR>
      <NUTS CODE="AT" />
      <DATE_START>2020-09-07</DATE_START>
      <DATE_END>2021-07-05</DATE_END>
    </OBJECT_DESCR>
  </OBJECT_CONTRACT>
  <LEFTI />
  <PROCEDURE>
    <PT_COMPETITIVE_NEGOTIATION />
    <DATETIME_RECEIPT_TENDERS>2020-04-01T10:00:00+02:00</DATETIME_RECEIPT_TENDERS>
  </PROCEDURE>
  <COMPLEMENTARY_INFO />
  <ADDITIONAL_CORE_DATA>
    <DATE_FIRST_PUBLICATION>2020-02-26</DATE_FIRST_PUBLICATION>
    <DATETIME_LAST_CHANGE>2020-03-19T08:28:29.5402657Z</DATETIME_LAST_CHANGE>
  </ADDITIONAL_CORE_DATA>
</KD_8_1_Z2>